Here's the answer with the current price table, per million tokens in and out: the fast tier at $1 and $5, the workhorse at $2 and $10, the balanced flagship at $5 and $25, the frontier at $10 and $50. Translate before budgeting: a million tokens is roughly 750,000 words, so the fast tier reads a novel-length input for about a dollar, and a typical assignment with a thorough report runs cents.
The costs that actually add up are structural: long sessions re-sending giant context every turn, fan-outs multiplying identical context, frontier models doing mechanical work, and automations running unread. Token waste is almost always architecture waste.
Three levers cut the bill with zero quality change. Tier discipline: assign the cheapest model that passes your acceptance criteria, proven by blind test, run the same assignment one tier down and grade both blind, and keep the cheaper one when you can't tell, because you often can't. Caching: your stable context, the instruction law, the employee files, re-reads at one-tenth the input price as long as it stays identical. Batching: anything on a schedule that can wait takes 50 percent off just for not needing an instant answer.
One rule bounds the thrift: never cheap out where your name lands. Client deliverables and money decisions get the model your reputation deserves. The savings live in the invisible middle of pipelines.
Then read it weekly like a P&L, three lines: what did the operation spend, what did it ship, and which pipeline's cost-per-outcome moved? Give it budget lines with teeth: expected, investigate at 1.5 times, stop at 2.
The full meter is Volume 6 of our Advanced Operator series.
The operator who knows each outcome's cost prices with confidence and spots leaks while they're cents.